Test Engineer, Power Conversion Charging System
Ford · On-site · Full-time · Dearborn, MI, United States, US
Posted (5d ago)
- Employer posted
- First seen here
- Repost check
- Same job ID since we first saw it on Nov 18, 2026. If Ford reposts it, we keep the original posting date.
- Level
- Mid-level
- Work setup
- On-site
- Ford hiring
- 114 roles posted in the last 30 days
Job description
In this position...
The Electric Vehicle Conductive Charging System Test Engineer will be responsible for
delivering the Battery Charge Control Module (BCCM, aka onboard vehicle charger) and Off
Board Charge Control (OBCC) module for new electric vehicle programs (Plug In Hybrid Electric
Vehicles/PHEV and Battery Electric Vehicles/BEV) on time with best in class quality.
Ford job ID: 74117
More Ford jobs
Software Development Manager
Ford · United States, US · Manager · On-site
We are not Ford. The hiring company owns this listing. Reposts of the same requisition id are not shown as new.
All new jobs · Companies we watch · How dates work · Report an error